I need someone who done the construction engineering reports to help me on this report. The number of pages depend on the report and this report is kind of long. I’ll provide you with all the pictures and Info.Laboratory assignments will be completed as TYPED reports with the following sections:1. Project (location, description, participants)2. Project Conditions (project status, weather, on day visited)3. Answers to specific questions for the lab4. Summary and conclusionsThe lab report can be as long as needed in order to complete the assignment. Professionalwork is expected. Use a table of contents, figures and tables should be referenced andhave captions, and so on. You may have attachments, which should be neat, clean, andfirmly attachedFigures: Project description with photos and maps as needed, provide photos for all itemsrequested.Safety toolbox: Reference OSHA section numbers, answer all questions with sufficient detail,use appropriate figures.2. Appearance and organization:Professional Appearance: Typed, not congested, not much empty space, use paragraphsWell organized/easy to find things: TOC, LOF, page numbers, section titles, items discussed incorrect order, attachments well organized.Use of figures: Figures and tables are numbered, captioned, and referenced in the text, set inline with text (do not wrap with text).3. Language: Use technical writing style, short and clear sentences, use correct spelling and grammar, useparagraphs.
lab_06__concrete_construction___jr_construction.pdf

Unformatted Attachment Preview

Don't use plagiarized sources. Get Your Custom Essay on
Construction Concrete
Just from $13/Page
Order Essay

If you see unsafe behavior and don’t
correct it, you are condoning it.
LAB 6 – CONCRETE CONSTRUCTION
Host: Level 10 Construction & JR Construction Inc.
Project: K1
During our next field trip you will observe concrete construction techniques. Our host is Level 10
Construction & JR Construction INC. and the project is the K1 project.
1. PROJECT DESCRIPTION
This standard report section should include description of the project, the status at the day of
the visit (work progress, current work including trades and manpower) and the main
participants. Make sure to provide the name of the owner, general contractor and key
subcontractors
2. CONCRETE COMPONENTS
What concrete components does the scope of the concrete work include?
Provide photos and description of the main components (i.e., columns, post tensioned slabs,
waffle slabs? Drop beams, shear walls, etc.).
3.
FORMWORK
What forming systems does the contractor use to form?
(1) the walls and columns,
(2) the slabs and beams?
What are the components of the forming systems?
3.1 Slabs formwork: Describe the components of the formwork and provide a LABELED
PHOTOGRAPH or SKETCH showing ALL the elements in the forming system, from the
ground up to the surface which will become the bottom of the concrete floor.
3.2 Long and/or Short Span Beams. How are the beams formed? Explain and provide 1-2
photos of the Cunningham system.
3.3 Walls and columns formwork: Describe the components of the formwork and provide a
LABELED PHOTOGRAPH or SKETCH showing ALL the elements in the wall/column
forming system.
3.4 Components: What is a waler?
Did the system you observed use walers?
What is a taper tie? Explain how a taper tie works. Does it show when the work is finished
– why or why not?
4. FORMWORK LOGISTICS
How many sets of forms does the contractor need to have on site?
Lab 6: Concrete Construction – Page 1 | C O N E 2 8 0
Why so many?
Where are the forms assembled?
What trade assembles the form?
What is the crew size and main tasks?
How do they get from the point of assembly to their installation point?
How are they lifted in place?
What equipment is used?
Show relevant photos and site layout sketches to explain your answers.
What type of crane was used for this project? Why?
What is the reach and capacity?
Why was the specific crane location selected?
WHICH contractor provided the crane?
Who plans, reviews, and approves the crane lifts?
Does the concrete operation involve any critical lifts?
How many trades are currently using the crane (at the time of the visit)?
How is the time of the crane scheduled?
5.
REINFORCING STEEL
Rebar:
How is the rebar delivered to the site, and where are the rebar “cages” assembled?
How are the individual pieces held together?
What kind of workers put the rebar in place?
Who do they work for (general contractor, concrete contractor, …?)
The reinforcing steel ends up encased inside the concrete. How do they hold the steel
away from the formwork so that it will be covered or protected from corrosion? (show in a
photograph).
Post-tensioned slab and beams:
What is a Post tension slab / beam?
Why are they used (what are the advantages)?
How are they constructed?
What are the key components (provide photos if possible).
How many days does the concrete have to cure before the cables are tensioned? Why?
6.
EMBEDS and PENETRATIONS
What kinds of things other than reinforcing steel are embedded in the concrete during
construction of slab or walls?
Find and provide a labeled photograph of at least two different types (for example, conduit,
sleeves, welding plates, anchor bolts,).
How are they held in place?
Lab 6: Concrete Construction – Page 2 | C O N E 2 8 0
How many different trades have components (or penetrations) to place?
Who puts that stuff in?
What happens if embeds are not available on schedule?
What happens if the embeds are damaged or displaced during concrete placement – who
has to fix that, at whose cost?
What happens if a penetration is missed?
Can the contractor drill the slab after it is poured?
7.
CONCRETE
What kind of concrete is used for the slab, walls, and columns?
What is the design strength (in psi)?
What is the slump?
How does the contractor make sure that there will be no voids at the bottom of the walls?
Where does the concrete come from?
How is the concrete delivery sequenced and coordinated?
8.
SCHEDULE AND SEQUENCE OF WORK
How long does it take to build each floor level?
In what sections does the contractor pour the deck and walls?
Why was this section size selected?
How long do the reshores have to stay in place?
WHAT ARE THE STEPS in constructing each floor of the structure? Include all steps
starting with layout until the floor is completely ready for the next operation. Who is
performing each step? What tools they use? A detailed answer is expected, documented
with photographs for key steps. You will be able to see several stages in the process by
looking at the work in progress.
•
•
•
•
•
Activity description
Who performs
Material, Equipment, Tools
9.
INSPECTIONS
What inspections are performed related to the formwork, rebar and concrete placement?
For each inspection, indicate: Who performs the inspection? What does each inspection check?
What specific requirements need to be satisfied to pass the inspection?
Lab 6: Concrete Construction – Page 3 | C O N E 2 8 0
Inspection
Who performs
What is checked and what are the requirements
10.
SAFETY TOOLBOX
For this assignment, review the OSHA standards for construction in relation to concrete and
masonry construction (subpart Q).
1. For each section of subpart Q, provide a brief summary indicating the key issues that the
section addresses.
2. Identify and review the section that states the requirements for cast-in-place concrete.
3. Select five requirements from that section, and indicate how does the contractor addresses
these requirements on the project. Make sure to reference the specific OSHA paragraph
citation to back up your answer. Provide photos to demonstrate the use of the contractor’s
practices. Use the format shown below.
Section:
Paragraph
Requirement
How the contractor addressed
Lab 6: Concrete Construction – Page 4 | C O N E 2 8 0

Purchase answer to see full
attachment

GradeAcers
Calculate your paper price
Pages (550 words)
Approximate price: -

Why Work with Us

Top Quality and Well-Researched Papers

We always make sure that writers follow all your instructions precisely. You can choose your academic level: high school, college/university or professional, and we will assign a writer who has a respective degree.

Professional and Experienced Academic Writers

We have a team of professional writers with experience in academic and business writing. Many are native speakers and able to perform any task for which you need help.

Free Unlimited Revisions

If you think we missed something, send your order for a free revision. You have 10 days to submit the order for review after you have received the final document. You can do this yourself after logging into your personal account or by contacting our support.

Prompt Delivery and 100% Money-Back-Guarantee

All papers are always delivered on time. In case we need more time to master your paper, we may contact you regarding the deadline extension. In case you cannot provide us with more time, a 100% refund is guaranteed.

Original & Confidential

We use several writing tools checks to ensure that all documents you receive are free from plagiarism. Our editors carefully review all quotations in the text. We also promise maximum confidentiality in all of our services.

24/7 Customer Support

Our support agents are available 24 hours a day 7 days a week and committed to providing you with the best customer experience. Get in touch whenever you need any assistance.

Try it now!

Calculate the price of your order

Total price:
$0.00

How it works?

Follow these simple steps to get your paper done

Place your order

Fill in the order form and provide all details of your assignment.

Proceed with the payment

Choose the payment system that suits you most.

Receive the final file

Once your paper is ready, we will email it to you.

Our Services

No need to work on your paper at night. Sleep tight, we will cover your back. We offer all kinds of writing services.

Essays

Essay Writing Service

No matter what kind of academic paper you need and how urgent you need it, you are welcome to choose your academic level and the type of your paper at an affordable price. We take care of all your paper needs and give a 24/7 customer care support system.

Admissions

Admission Essays & Business Writing Help

An admission essay is an essay or other written statement by a candidate, often a potential student enrolling in a college, university, or graduate school. You can be rest assurred that through our service we will write the best admission essay for you.

Reviews

Editing Support

Our academic writers and editors make the necessary changes to your paper so that it is polished. We also format your document by correctly quoting the sources and creating reference lists in the formats APA, Harvard, MLA, Chicago / Turabian.

Reviews

Revision Support

If you think your paper could be improved, you can request a review. In this case, your paper will be checked by the writer or assigned to an editor. You can use this option as many times as you see fit. This is free because we want you to be completely satisfied with the service offered.

Order your essay today and save 15% with the discount code DISCOUNT15